首页|On-site Condition Monitoring of HV Power Cables up to 150kV

On-site Condition Monitoring of HV Power Cables up to 150kV

扫码查看
For advanced, non-destructive on-site condition monitoring of HV power cables up to 150kV by partial discharge detection and dielectric losses measurement it is necessary to energize the disconnected cable system。 One of the methods available for this purpose is based on applying damped AC voltages up to 150kV。 In this contribution, the use of modern technological solutions in power electronics and signal processing as well as in technical design and production methods will be discussed on the basis of ultra light system which is able to on-site service aged HV cables。

HV power cables, on-site testing, diagnosis, partial discharges, dielectric losses, PD site localization, condition monitoring

Yu GAO、Chuanping FENG、Chao LIU

展开 >

E. Gulski@Delft University of Technology,Delft,The Netherlands--P. Cichecki@Delft University of Technology,Delft,The Netherlands--J.J. Smit@Delft University of Technology,Delft,The Netherlands--P.P. Seitz@Seitz Instruments AG,Switzerland--B. Quak@Seitz Instruments AG,Switzerland--F. de Vries@Nuon Tecno,The Netherlands--

CMD 2008;International Conference on Condition Monitoring and Diagnosis

Beijing(CN)

Proceedings of 2008 International Conference on Condition Monitoring and Diagnosis(CMD 2008) pt.2

1-4

2008