首页|MONITORING ON HR-VENTHYBRID VENTILATION PROJECT - FIRST RESULTS

MONITORING ON HR-VENTHYBRID VENTILATION PROJECT - FIRST RESULTS

扫码查看
More than 700 million of measured data, 730 days, 55 dwellings: the HR-VENT hybrid ventilationdemonstration project applied in NANGIS (France) on a set of occupied collective dwellings is closely linked toits stakes。 From January 2004 up to December 2005, the values of humidity, temperature, pressure, openingsurface and gas appliance operation are saved every minute in all the wet rooms by specifically developedsensors。 The first results of these new hybrid ventilation system monitoring are presented in this document。In particular, directly linked to the local meteorological data, these measurements aim to evaluate the ability ofthe new hybrid ventilation system to erase the back draught effects。 Moreover, it is again possible to show thecorrelation between indoor relative humidity and IAQ。 Pressure differences and airflows comparisons betweenstoreys, influences of wind velocities and outdoor temperatures during a really significant period is well inagreement with the previous 1993 "Passive humidity controlled ventilation for existing dwellings" -Demonstration project EE/166/87”。

Measurementsresultspassive stack ventilationhybrid ventilationmonitoringHR-VENT

Siret F.、Savin J.L.、Jardinier M.、Berthin S.

展开 >

Aereco S.A., 9 allée du Clos des Charmes, CollégienF - 77615 MARNE LA VALLEE Cedex 3

AIVC conference;AIVC conferences 1998-2004

Prague(CZ);

Ventilation and retrofitting

1-8

2004