首页|Research and Application of Integrated Scheduling System of Steelmaking-Continuous Casting-Hot Rolling in Shagang Group

Research and Application of Integrated Scheduling System of Steelmaking-Continuous Casting-Hot Rolling in Shagang Group

扫码查看
In this paper, a mathematical model of scheduling system is developed based on the analytical investigation in Steelmaking-Continuous Casting-Hot Rolling process, additionally, according to which an integrated scheduling system is established and being put into practice in Shagang Group。 The application of the system achieves that more than 90% hot delivery and hot charging ratio is conserved in the process, more than 5% oxidization loss is reduced in the process of Continuous Casting (conticast) slabs and consumption of reheating furnace is ≤0。95GJ/t in per kilo product。

conticast slabshot delivery and hot chargingmathematical modelonline control

Liu Lijun、Wen Zhi、Su Fuyong、Dou Ruifeng、Liu Xunliang、Lou Guofeng

展开 >

Thermal Eenergy Engineering Department, University of Science and Technology Beijing, Beijing 100083, China

ICMET 2011;International conference on mechanical engineering and technology

London(GB);London(GB)

Mechanical engineering and technology

p.477-483

2011