首页|Joint production-maintenance planning in an imperfect system with quality degradation

Joint production-maintenance planning in an imperfect system with quality degradation

扫码查看
In this paper, lot sizing problem is integrated with preventive maintenance scheduling taking into account several aspects of the quality system。 Integration of such highly dependent decisions in the same mathematical model results in an efficient decision structure, and it can reduce the costs。 The significance of the savings resulted from joint models supports the competency of the organization。 Age based imperfect maintenance with increasing hazard rate and its influences on production and quality systems is addressed, and related cost evaluations are developed。 Length of quality inspection intervals is determined such that the integrated hazard rates over all segments of a period for a certain machine are equal。 The optimum value of the integrated hazard depends on multiple factors, including reworking cost, backorder cost, production size, etc。 The mathematical model is a nonlinear optimization problem and a genetic algorithm is used to solve it。 A numerical example and extensive investigations are also conducted。

Age based maintenanceImperfect systemIntegrated modelLot schedulingQuality

Hossein Beheshti Fakher、Mustapha Nourelfath、Michel Gendreau

展开 >

Dept. of Mech. Eng., LAVAL Univ., Quebec City, QC, Canada

International Conference on Industrial Engineering and Systems Management

Seville(ES)

Proceedings of 2015 International Conference on Industrial Engineering and Systems Management: The Road Ahead: Understanding Challenges and Grasping Opportunities in Industrial and Systems Engineering

910-919

2015