鞍钢技术2024,Issue(3) :59-63.DOI:10.3969/j.issn.1006-4613.2024.03.0011

炼钢生产中氩站直上浇注工艺实践

Practice of Casting Process by Directly Blowing Argon Upward from Argon Station during Steelmaking Production

尚德义 李超 黄岩 李文博
鞍钢技术2024,Issue(3) :59-63.DOI:10.3969/j.issn.1006-4613.2024.03.0011

炼钢生产中氩站直上浇注工艺实践

Practice of Casting Process by Directly Blowing Argon Upward from Argon Station during Steelmaking Production

尚德义 1李超 1黄岩 1李文博1
扫码查看

作者信息

  • 1. 鞍钢股份有限公司鲅鱼圈钢铁分公司,辽宁营口 115007
  • 折叠

摘要

选取SPHC钢种进行了氩站直上浇注工艺试验.采取了制定生产组织时间参考表和工艺试验流程,两次加Mn控制其含量,按照终点氧含量确定加入铝线段重量,氩站吹氩参考温降4 ℃/min,按温降0.7 ℃/min对氩站搬出温度进行补正等措施.试验两浇次14罐钢水结果表明,钢水成分合格率100%,温度合格率100%,生产节奏正常,铸机浇注稳定,试验罐次节约成本约15.6万元.

Abstract

The SPHC molten steel was selected for carrying out the test of casting process by directly blowing argon upward from the argon station.After that,these measures such as formulat-ing the production organization time reference table and determining the process test flow,adding the element of Mn twice by controlling its amount of addition,determining the weight of adding a section of aluminum wires according to the content of oxygen at the end point,setting the reference temperature drop as 4 ℃/mini for argon blowing from the argon station and carrying out the supple-menting and correcting for the moving-out temperatures of argon from the argon station according to the temperature drop of 0.7 ℃/min were taken.So based on testing of casting 14 tanks of molten steel by casting two times,the tested results demonstrated that the qualified rate of both composi-tions and temperatures was 100%.Finally,the production interval was normal and the casting ma-chine was operating in the stable condition and the cost of testing tanks of molten steel reduced by about 156 thousand yuan.

关键词

炼钢/氩站直上浇注/SPHC钢种/Mn含量/Als含量/钢水温度

Key words

steelmaking/directly blowing argon upward from argon station/SPHC steel/con-tent of Mn/content of Als/temperature of molten steel