基于吊车用放线滑车跨越装置的输电线路跨越施工方法

扫码查看
输电线路架设过程中,跨越电力线、道路等情况越来越多.由于高电压等级电力线跨越高度高,造成跨越施工难度大,而传统方式采用搭设跨越架形式,跨越架体高大,施工成本高,安全风险大.因此,对跨越电力线、道路等输电线路架设施工方法开展研究.通过与传统跨越施工方式对比,基于吊车用放线滑车跨越装置的输电线路跨越施工方法,降低了施工成本和施工风险.
Construction Method for Overhead Transmission Line Crossings Using Crane-Mounted Cable-Pulling Trolleys
In the construction of transmission lines,more and more power lines and roads are crossed.The height of high voltage grade power lines makes it difficult to cross the construction.Traditional methods in-volve setting up tall scaffolding structures for crossing,which lead to high construction costs and considera-ble safety risks.Therefore,the study of the crossing construction methods of lines and roads is conducted. By comparing with traditional methods,the study explores a construction method for overhead transmission line crossings using crane-mounted cable-pulling trolleys,which can reduce construction cost and risk.

cranecable-pulling trolleyscrossing

潘康、崔青松、陈夕康

展开 >

安徽送变电工程有限公司, 安徽 合肥 231202

吊车 放线滑车 跨越

2024

安徽电气工程职业技术学院学报
安徽电气工程职业技术学院

安徽电气工程职业技术学院学报

影响因子:0.287
ISSN:1672-9706
年,卷(期):2024.29(1)