首页|基于ITTO技术"一带一路"石化项目的现场安全管理模型研究

基于ITTO技术"一带一路"石化项目的现场安全管理模型研究

扫码查看
针对"一带一路"石化项目的安全管理难度大和社会影响力广泛等特点,提出了"事前预防、过程管控、事后评价"的现场安全管理思路,构建了基于ITTO 技术的现场安全管理模型并应用于工程项目管理中.实践证明该模型实现了项目安全管理的标准化和信息化,解决了因一系列复杂因素对石化工程项目现场安全管理带来的挑战,从而取得了良好社会效果.
Research on Site Safety Management Model of"Belt and Road"Petrochemical Project Based on ITTO Technology
Regarding the difficulty of safety manage-ment and wide social influence of petrochemical pro-jects along the Belt and Road,the site safety manage-ment idea of"pre-prevention,process control and post-evaluation"was proposed,and a site safety management model based on ITTO technology was constructed and applied to engineering project man-agement.Practice had proved that the model realized standardization and informatization of project safety management,solved the challenges brought by a se-ries of complex factors to the on-site safety manage-ment of petrochemical engineering projects,and a-chieved good social effects.

belt and roadpetrochemical projectssite safety managementITTO modelsresearch and practice

史海鹏

展开 >

中石化南京工程有限公司,江苏南京 210049

一带一路 石化项目 现场安全管理 ITTO模型 研究与应用

2024

安全、健康和环境
中国石油化工股份公司青岛安全工程研究院

安全、健康和环境

影响因子:0.334
ISSN:1672-7932
年,卷(期):2024.24(2)
  • 6