本文以漫湾特大桥 4×28 m有砟轨道预应力混凝土道岔连续梁为研究对象,采用"土牛法"支撑体系构造、大截面弧形模板安装加固、大面积混凝土一次性浇筑施工要点控制等一系列技术措施.简化了连续梁的支撑体系及模板体系,确保了施工中几项要点的顺利完成,保证了桥梁工程的安全、质量,节约了工期、成本,同时也为相似工程中矮墩连续梁的施工提供一定参考.
Construction Technology of Large Curved Continuous Beam on Short Pier of Manwan Bridge
This paper takes the continuous beam of 4×28 m ballasted track prestressed concrete turnout of Man-wan Bridge is taken as the research object,and adopts a series of technical measures,such as"native cattle method"support system construction,large section arc formwork installation and reinforcement,large area of con-crete one-time pouring construction key control.It simplifies the support system and formwork system of continu-ous beam,ensures the smooth completion of several key points in construction,ensures the safety and quality of bridge engineering,saves the construction period and cost,and also provides some ideas for reference for the con-struction of short pier continuous beam in similar projects.

"native cattle method"supportlarge section arc formworklarge area concrete

张家鹏

展开 >

中铁二十二局集团第二工程有限公司,北京 100043

"土牛法"支撑 大截面弧形模板 大面积混凝土

2024

北方建筑

北方建筑

ISSN:
年,卷(期):2024.9(1)
  • 3