首页|铁路施工企业钢筋集中加工厂设置现状及管理要求

铁路施工企业钢筋集中加工厂设置现状及管理要求

扫码查看
本文通过实际案例,强调钢筋集中加工厂的重要性,包括成本降低、精细化管理、质量控制、机械化水平提高等方面的益处,同时详细分析了目前铁路隧道和桥梁钢筋加工现状,并指出传统分散式的加工方式存在劳动强度大、浪费原材料、大面积施工难度高等问题.最后,对钢筋集中加工厂的管理要求进行阐述,包括工程概况、场地建设、规划布局、过程控制、物资管理、文明施工等方面的措施.结果表明,通过采用集中加工方式,铁路施工企业能够提高效率、降低成本、确保施工质量,并实现可持续发展,该研究对铁路建设和相关领域的实践具有重要的指导意义.
Current Situation and Management Requirements of Steel Bar Centralized Processing Plant in Railway Construction Enterprises
Through practical cases,this paper emphasizes the importance of centralized steel processing plant,in-cluding the benefits of cost reduction,fine management,quality control,and improvement of mechanization level,at the same time,it analyzes the current situation of steel processing in railway tunnels and Bridges in detail,and points out that the traditional distributed processing method has problems such as high labor intensity,waste of raw materials,and high difficulty in large-scale construction.Finally,the management requirements of the rebar centralized processing plant are elaborated,including the project overview,site construction,planning and layout,process control,material management,civilized construction and other measures.The results show that railway construction enterprises can improve efficiency,reduce cost,ensure construction quality and achieve sustainable development by adopting centralized processing method,this study has important guiding significance for railway construction and related fields practice.

reinforcing bardistributedlayoutmanagementfining

李兴光

展开 >

中铁二十局集团第四工程有限公司,天津 301700

钢筋 分散式 布局 管理 精细化

2024

北方建筑

北方建筑

ISSN:
年,卷(期):2024.9(3)