Analysis of Construction and Operating Mode of Multi Energy Integration Technology System for Port Ship
To make full use of the abundant renewable resources of wind and solar energy in the port area, amulti-energy integration system for port and ship has been constructed which consists of four parts named"source-network-load-storage". A condition monitoring and energy management system has been established to ensure the safe operation of the multi-energy integration system. The operation mode of the multi-energy integration system, which includes horizontal multi-energy complementary mode and vertical"source- network-load-storage" coordination and interaction, is formulated. The multi-energy integration system for port and ship can realize the comprehensive utilization of new energy, reduce the emission of CO2 and other greenhouse gases, and contribute to the realization of the goal of "carbon peak and carbon neutrality".