Risk Analysis and Control of Railway Tunnel under Highway
This paper aims to use 6M1E(man,machine,material,method,measurement,management,environment)comprehensive analysis method,the safety risk factors during the construction of Lingya Tunnel of Lwzq-7 lwz.Through the reverse thinking,starting from the potential accident types,this artical traced back to the source of risk,and then put forward a series of targeted,highly operational safety control measures.These measures not only provide a solid safety guarantee for the construction of Lingya Tunnel,but also provide a targeted basis for the formulation of subsequent special construction plans and the implementation of on-site safety management,it provides a model and strategy of risk prevention and control for similar railway tunnel crossing expressway projects.