首页|页岩陶粒混凝土预制构件钢筋浆锚连接性能试验研究

页岩陶粒混凝土预制构件钢筋浆锚连接性能试验研究

扫码查看
为了验证页岩陶粒混凝土预制构件纵向受力钢筋采用浆锚连接的适用性和可靠性,对采用该连接形式的钢筋连接试件分别进行了单向拉伸、高应力反复拉压和大变形反复拉压试验,分析页岩陶粒混凝土强度和钢筋搭接长度对其连接性能的影响.试验结果表明:所有试件纵筋均未出现滑移,试件的最终破坏均为接头外钢筋被拉断或屈服;采用浆锚连接的钢筋搭接长度不宜小于1. 0laE;当钢筋搭接长度大于等于1.0laE时,随着页岩陶粒混凝土强度的增加,试件接头的极限抗拉强度有所提高.在满足规定的构造要求下,钢筋浆锚连接形式可用于页岩陶粒混凝土预制构件纵向受力钢筋的可靠连接.
Experimental analysis on connection performance of grouted steel bars in prefabricated shale ceramsite concrete components
In order to verify the applicability and reliability of longitudinal reinforcing steel grouted connecting in prefabricated components of shale ceramsite concrete,specimens were tested under monotonic tension test,high strength cyclic load test and large deformation cyclic load test.The influencing factors on connection performance including the strength of shale ceramsite concrete and lapping length of steel were analyzed.The test results indicate that no slippage occurs in all specimens'longitudinal steel,and the ultimate failure of all specimens are steel outside the splice broken up or yielding.It is suggested that the lapping length of grouted steel should not be less than 1.0laE.When the lapping length of steel is greater than or equal to 1.0laE,the ultimate tensile strength of splice will be increased with the higher strength of shale ceramsite concrete.The grouted connecting is suitable for the reliable connection of longitudinal reinforcing steel in prefabricated components of shale ceramsite concrete,when it satisfies certain structural requirements.

shale ceramsite concreteprefabricated componentsgrouted connectionconnection performanceexperimental study

谷倩、张鹏、饶依文、陈荣亮

展开 >

武汉理工大学 土木工程与建筑学院,武汉430070

美好建设有限公司,武汉430071

页岩陶粒混凝土 预制构件 浆锚连接 连接性能 试验研究

国家"十二五"科技支撑计划湖北省建设科技计划武汉市城建科研计划

2014BAB15B01鄂建文[2015]67号武城建[2014]205号

2018

土木建筑与环境工程
重庆大学

土木建筑与环境工程

CSTPCDCSCD北大核心
影响因子:0.878
ISSN:1674-4764
年,卷(期):2018.40(3)
  • 6
  • 6