摘要
5G基站的规模化部署为5G赋能千行百业奠定了基础,在"双碳"战略背景下,5G基站的节能减排面临巨大挑战.文章结合5G基站的用能现状及行业绿色发展目标,从建设流程、建设成本、实施难度、施工周期、系统效率等方面对基站交流和直流叠光解决方案进行分析,为基站规模化应用直流叠光系统提供参考.
Abstract
The large-scale deployment of 5G base stations has laid the foundation for empowering thousands of industries with 5G technology,in the context of the"carbon peaking and carbon neutrality"strategy,the energy conservation and emission reduction of 5G base stations are facing enormous challenges.Based on the current situation of energy consumption of 5G base stations and the green development goals of the industry,this paper analyzes the solutions for AC and DC stacked photovoltaic in base stations from the aspects of construction process,construction cost,implementation difficulty,construction period,system efficiency,etc.,providing reference for the large-scale application of DC stacked photovoltaic systems in base stations.