扫码查看
以甘肃省内某一黄土隧道工程为研究对象,进行实测,分析了台阶法施工过程围岩压力的变化特征.采用智能压力传感器,分别连续采集隧道下台阶、仰拱、二次衬砌施工前后7d的围岩压力数据;同时,采用数据处理软件,分析了隧道施工各工序对隧道围岩压力的影响.分析发现:隧道二次衬砌施工对隧道围岩压力影响最大,其次是下台阶施工,而仰拱施工对围岩压力的影响最小;隧道下台阶施工对隧道拱腰部位围岩压力的影响最大;隧道二次衬砌施工后,围岩压力呈先下降后升高的趋势.
Measurement and Analysis of the Variation Characteristics of Surrounding Rock Pressure During the Construction Process of Loess Tunnel Step Method
Taking a loess tunnel project in Gansu Province as the research object,the variation characteristics of surrounding rock pressure during the step method construction process were analyzed through actual measurement . Using intelligent pressure sensors,continuously collect rock pressure data for 7 days before and after the construction of the lower steps,inverted arches,and secondary lining of the tunnel;At the same time,data processing software was used to analyze the impact of various construction processes on the surrounding rock pressure of the tunnel .Analysis shows that the secondary lining construction of the tunnel has the greatest impact on the surrounding rock pressure of the tunnel,followed by the lower step construction,while the inverted arch construction has the smallest impact on the surrounding rock pressure;The construction of the lower steps of the tunnel has the greatest impact on the surrounding rock pressure at the arch waist of the tunnel;After the secondary lining construction of the tunnel,the surrounding rock pressure shows a trend of first decreasing and then increasing .

loess tunneltunnel surrounding rocksurrounding rock pressurestep method constructionsecondary lining

郝东、胡文斌、王海堂、王照、李毅、潘吉祥

展开 >

甘肃路桥建设集团有限公司 甘肃新路交通工程有限公司,甘肃 兰州 730300

黄土隧道 隧道围岩 围岩压力 台阶法施工 二次衬砌

2024

成组技术与生产现代化
机械工业第六设计研究院,中国机械工程学会成组技术分会,中原工学院

成组技术与生产现代化

影响因子:0.526
ISSN:1006-3269
年,卷(期):2024.41(2)