Application Analysis of Measuring Robot ATR Automatic Aligning Technology in Deformation Monitoring
In this paper,the error factors of the commonly used polar coordinate method in foundation pit monitoring are analyzed,and the accuracy of the observation data of the ATR measurement mode of the measuring robot is statistically analyzed.The feasibility and reliability of the ATR measurement mode of the measuring robot in the monitoring of the displacement and deformation of the founda-tion pit are verified by comparing it with the manual aligning measurement mode.Meanwhile,SOKKIA NET05AXII measuring robot is used to carry out the displacement monitoring on the foundation pit construction project of a trade center,which is basically consistent with the monitoring data of traditional manual aligning measurement mode.Moreover,the operating efficiency of ATR measuring mode of the measuring robot is relatively higher.Meanwhile,under the condition of remote monitoring,the measurement accuracy of ATR measuring mode of the measuring robot is relatively higher,which can provide more accurate and reliable deformation monitoring data for foundation pit construction.