首页|雅砻江流域水风光一体化示范基地抽水蓄能电站建设中关键技术与研究

雅砻江流域水风光一体化示范基地抽水蓄能电站建设中关键技术与研究

扫码查看
在"双碳"战略发展目标驱动下,抽水蓄能电站开发进程加快.本文介绍了雅砻江流域水风光一体化示范基地抽水蓄能电站概况,开发建设过程中的高岩坎拆除、宽变幅水泵水轮机、下水库抽水可靠性、水-风-光-蓄多能互补一体化运行调度、高寒高海拔下电气设备绝缘电晕、水库防渗、高寒高海拔地区TBM及电动施工设备等关键技术的研究与应用情况,为高寒高海拔地区抽水蓄能电站的关键技术问题提供参考.
Key Technologies and Research in the Construction of Pumped Storage Power Stations at the Yalong River Integrated Demonstration Base
The development process of pumped storage power plants has been accelerated by the"dual carbon"strategic development goal.This paper presents an overview of the pumped storage power station in Yalong River Basin,along with research and application of key technologies such as high rock sill removal,wide-amplitude pump turbine,pumping reliability of lower reservoir,integrated operation and scheduling of water-wind-light-storage multi-energy complementarity,insulation corona of electrical equipment under high cold and high altitude,seepage prevention of reservoir,TBM in high cold and high altitude areas and electric construction equipment.This paper offers insights into addressing key technical challenges faced by pumped storage power stations in high cold and high altitude areas.

pumped storagehigh cold and high altitudewide variationpumping safetyhigh rock ridgemulti-capability coordination and complementary scheduling

王继敏、严登权、赵丹

展开 >

雅砻江流域水电开发有限公司,四川省成都市 610000

抽水蓄能 高寒高海拔 宽变幅 抽水安全性 高岩坎 多能协调互补调度

2024

水电与抽水蓄能
国网电力科学研究院

水电与抽水蓄能

影响因子:0.247
ISSN:2096-093X
年,卷(期):2024.10(3)
  • 6