水电与抽水蓄能2024,Vol.10Issue(4) :7-13.DOI:10.3969/j.issn.2096-093X.2024.04.002

抽水蓄能电站防沙措施研究

Study on Sediment Control Measures for Pumped Storage Power Stations

赵海镜 张捷 张防修 李晓伟 程涛
水电与抽水蓄能2024,Vol.10Issue(4) :7-13.DOI:10.3969/j.issn.2096-093X.2024.04.002

抽水蓄能电站防沙措施研究

Study on Sediment Control Measures for Pumped Storage Power Stations

赵海镜 1张捷 1张防修 2李晓伟 1程涛1
扫码查看

作者信息

  • 1. 中国电建集团北京勘测设计研究院有限公司,北京市 100024
  • 2. 黄河水利科学研究院,河南省郑州市 450003
  • 折叠

摘要

以典型抽水蓄能电站为研究对象,开展了水库防沙措施研究.针对复杂工程条件,在分析各种防沙布置措施的基础上,考虑以沉代拦、导沉结合,提出导沙堤和尾水明渠相结合的防沙布置型式.经过数值模拟和物理模型验证,该型式减少过机泥沙效果明显,水力学参数合理.研究成果可为类似工程规划、设计和运行提供参考.

Abstract

A study was conducted on sediment control measures for reservoirs,focusing on typical pumped storage power stations.Based on the analysis of various sediment control measures for complex engineering conditions,considering the replacement of interception with sedimentation,and combination of diversion and sedimentation,a sediment control layout form combining a diversion embankments and a tailwater channel is proposed.After numerical simulation and physical model verification,this type has a significant effect on reducing sediment passing through the machine,and the hydraulic parameters are reasonable.The research results can provide reference for similar engineering planning,design,and operation.

关键词

抽水蓄能电站/防沙措施/导沉结合/导沙堤/尾水明渠

Key words

pumped storage power station/sediment control measures/diversion and sedimentation combination/sediment diversion embankment/tailwater channel

引用本文复制引用

基金项目

国家自然科学基金黄河自然科学基金黄河水科学研究联合基金项目(U2243232)

中国电力建设股份有限公司科技项目(DJ-ZDXM-2022-10)

水电水利规划设计总院科技项目(ZX-KJGH-20220003)

中国电建集团北京勘测设计研究院有限公司科研项目(KY20230111)

出版年

2024
水电与抽水蓄能
国网电力科学研究院

水电与抽水蓄能

影响因子:0.247
ISSN:2096-093X
段落导航相关论文