Based on the analysis of the climatic condition around the hydropower tunnel according to different a different climatic conditions.Analyzing the seepage way of water in the water-diversion system with Concrete lining.The trend of choosing steel penstock in the area of less rainfall area is rational.The results indicate that in the process of steel lining form design optimization,in addition to considering the geological condition of surrounding rock,also should pay attention to the local annual precipitation and annual evaporation capacity,geographical characteristics and hydrogeological conditions.These results have certain value to similar engineering projects.
关键词
抽水蓄能电站/水文地质条件/多因素分析/衬砌形式
Key words
pumped storage power station/hydrogeological conditions/multi-factor analysis/lining form