首页|考虑容量和库容备用的抽水蓄能电站多目标优化调度

考虑容量和库容备用的抽水蓄能电站多目标优化调度

扫码查看
抽水蓄能电站具有调峰填谷、调频调相以及在紧急情况下提供备用电源等多重作用,可保障电网安全稳定运行.然而,目前关于抽水蓄能电站备用功能与调峰填谷效益的关系研究得不够.本文考虑抽水蓄能电站机组备用和库容备用要求,构建了以电网负荷波动程度改善最大和电站运行效益最大为目标的抽水蓄能电站多目标日前调度模型,并应用该模型分析比较改变备用容量和备用库容大小对抽水蓄能电站运行收益影响.实例结果表明:对于典型场景折衷方案,当 1 台、2 台机组备用时,相应的电量效益减少百分比的平均值分别为 17.6%和 55.7%,波动改善率减少百分比平均值分别为 27.6%和 51.5%;上库备用水位提高 1m、2m时,电量效益减少百分比平均值为 3.3%和 25.1%,波动改善率减少百分比平均值分别为 13.4%和 26.3%.研究结果可供抽水蓄能电站制订备用及日前调度计划参考.
Multi-objective Optimal Scheduling of Pumped Storage Power Stations Considering Capacity and Capacity Reserve
Pumped storage power stations have multiple functions such as peak shaving and valley filling,frequency and phase modulation,and providing backup power in emergency situations,which can ensure the safe and stable operation of the power grid.However,there is currently insufficient research on the relationship between the backup function of pumped storage power stations and the benefits of peak shaving and valley filling.In this paper,considering the requirements of unit reserve and storage capacity reserve of pumped storage power plants,a multi-objective day ahead scheduling model of pumped storage power plants is constructed with the objective of maximizing the improvement of power grid load fluctuation and maximizing the operating benefits of pumped storage power plants.Further the model is used to analyze the impact of changing the sizes of reserve power generation capacity and reserve storage capacity on the operating benefits of pumped storage power plants.The example results show that for typical scenario compromise solutions,when one and two units are on standby,the average percentage reduction in electricity benefits is 17.6%and 55.7%,respectively,and the average percentage reduction in fluctuation improvement rate is 27.6%and 51.5%,respectively;When the reserve water level in the upper reservoir is increased by 1m and 2m,the average percentage reduction in electricity benefits is 3.3%and 25.1%,and the average percentage reduction in fluctuation improvement rate is 13.4%and 26.3%,respectively.The research results can be used as a reference for the pumped storage power station to formulate reserve and day ahead scheduling plans.

pumped-storage power stationpeak shaving and valley fillingmulti-objective optimizationreserve power generation capacityreserve storage capacity

万正喜、黄康康、傅勋利、王康乐、梅亚东

展开 >

湖南黑麋峰抽水蓄能有限公司,湖南省 长沙市 410213

武汉大学水资源工程与调度全国重点实验室,湖北省 武汉市 430072

抽水蓄能电站 削峰填谷 多目标优化 备用容量 备用库容

2024

水电与抽水蓄能
国网电力科学研究院

水电与抽水蓄能

影响因子:0.247
ISSN:2096-093X
年,卷(期):2024.10(6)