首页|地下式抽水蓄能电站可行性分析

地下式抽水蓄能电站可行性分析

扫码查看
地下抽水蓄能电站是利用地下空间作为抽水蓄能电站下水库,电站地下设施的建造可充分借鉴包括采矿业等其它行业的做法,具有高度的可行性。文中以某地下抽水蓄能电站为依托,经初步经济分析得出,当电站装机达到一定规模时具有一定的经济可行性;如果采用两级地下厂房串联,不仅能充分利用现有成熟主机设备开发地下抽水蓄能电站,而且展示出更加优异的经济性指标。此次研究分析可为开发地下抽水蓄能电站项目的早期决策提供参考。
Feasibility analysis of underground pumped storage power station
The underground pumped storage power station uses the underground space as the reservoir under the pumped storage power station.The construction of the underground facilities of the power station can fully learn from the practices of other industries,including mining industry,and has a high degree of feasibility.Based on an underground pumped-storage power station,it is concluded through preliminary economic analysis that when the installed power station reaches a certain scale,it has certain economic feasibility.If the two-stage underground plant is connected in series,it can not only make full use of the existing mature main equipment to develop underground pumped storage power station,but also show more excellent economic indicators.The research analysis can provide reference for the early decision of the project of developing underground pumped storage power station.

pumped storage powerundergroundseries connectioneconomyfeasibility

陈承宪、钱永丰、王春正、于淼、管永庆

展开 >

中国电力工程顾问集团东北电力设计院有限公司,吉林长春 130021

武汉理工大学,湖北武汉 430070

抽水蓄能 地下 串联 经济性 可行性

2025

东北水利水电
水利部松辽水利委员会

东北水利水电

影响因子:0.174
ISSN:1002-0624
年,卷(期):2025.43(1)