首页|昌化"9.3"特大暴雨移置分析与计算

昌化"9.3"特大暴雨移置分析与计算

扫码查看
当设计流域缺乏实测流量资料时,可以采用设计暴雨推求设计洪水.随着极端天气逐渐增多增强,在计算设计暴雨时,应重视流域周边特大暴雨对设计结果的影响,以确保工程安全.针对昌化"9.3"特大暴雨,通过分析并拟定暴雨移置方法,相较于未考虑"9.3"昌化特大暴雨影响的设计暴雨,设计流域所得设计暴雨结果明显更大.所提出的暴雨移置方法可为今后其他类似工程的规划设计提供参考,具有一定的推广应用价值.
Analysis and calculation of transposition of"9.3"extreme heavy rainstorm in Changhua
With a shortage of measured discharge data in the design basin,the design flood can be cal-culated by using the design rainstorm.With the gradual increase of extreme weather,in calculating the design rainstorm,attention should be paid to the influence of extreme heavy rainstorm around the basin on the design results to ensure the project safety.Analysis and calculation by rainstorm transposition method applied to the"9.3"extreme heavy rainstorm in Changhua show that the design rainstorm re-sults in the design basin are significantly larger,comparing with the design rainstorm without consider-ation of the impact from"9.3"extreme heavy rainstorm.The proposed rainstorm transposition method can provide reference for the planning and design of other similar projects in the future,and has popular-ization and application value.

Changhuaextreme heavy rainstormstorm transpositiondesign rainstorm

王卫远、陈美丹、张磊磊

展开 >

中国电建集团华东勘测设计研究院有限公司,浙江杭州,311122

昌化 特大暴雨 暴雨移置 设计暴雨

浙江省博士后科研择优资助项目

ZJ2021048

2024

大坝与安全
中国水力发电工程学会 国家电力公司大坝安全监察中心

大坝与安全

影响因子:0.2
ISSN:1671-1092
年,卷(期):2024.(1)
  • 28