首页|大黑汀水库坝基静力水准系统运行异常情况分析研究

大黑汀水库坝基静力水准系统运行异常情况分析研究

扫码查看
大黑汀水库坝基静力水准系统安装运行近20年,运行过程中,测点测值出现异常.通过监测系统测试、现场和监测资料检查、人工观测资料对比分析,对运行过程中存在的异常情况进行全面分析研究,查找静力水准系统运行异常原因,判定坝基垂直位移正常,坝体运行稳定,可供类似工程借鉴.
Analysis on abnormal operation of static leveling system for dam foundation of Daheiting reser-voir
The static leveling system for dam foundation of Daheiting reservoir has been in operation for nearly 20 years.During operation,abnormal values were detected at measuring points.Through the mon-itoring system test,on-site and monitoring data inspection,and manual observation data comparison and analysis,comprehensive analysis and study of the abnormal conditions existing in operation are con-ducted to find out the cause reasons,and it is determined that the vertical displacement of dam founda-tion is normal and the dam body is operating stably,which can be used for reference to similar projects.

engineering monitoringautomationstatic leveling systemabnormal operationdata analysis

赵利锋

展开 >

水利部海河水利委员会引滦工程管理局,河北 唐山,064300

工程监测 自动化 静力水准系统 运行异常 资料分析

2024

大坝与安全
中国水力发电工程学会 国家电力公司大坝安全监察中心

大坝与安全

影响因子:0.2
ISSN:1671-1092
年,卷(期):2024.(6)