STUDY ON AUTOMATIC DETECTION OF ENGINEERING PROJECT SCHEDULE AND DATA VISUALIZATION APPLICATION
The schedule control is critically important during project engineering design.The accurate detection of schedule is the key point to evaluate the progress of the project.The information transmitted among engineering design management systems will provide the basic data for automatic detection,and moreover to achieve automatic detection of the design schedule.The graphics and tables can be used to demonstrate the schedule visually,help the management staff to control the schedule directly by visual,therefore to enhance the project management and control level.