构皮滩第三级升船机塔柱顶板支撑系统设计与应用

Design and Application of the Top Plate Support System for the Third-Stage Ship Lift Tower at Goupitan

王小华
中国水能及电气化2024,Issue(3) :26-31,5.DOI:10.16617/j.cnki.11-5543/TK.2024.03.06

构皮滩第三级升船机塔柱顶板支撑系统设计与应用

Design and Application of the Top Plate Support System for the Third-Stage Ship Lift Tower at Goupitan

王小华1
扫码查看

作者信息

  • 1. 中国水利水电第十六工程局有限公司,福建 福州 350003
  • 折叠

摘要

构皮滩水电站第三级垂直升船机是国内外规模最大的卷扬垂直提升下水式升船机,塔柱顶板具有施工高度大、跨度大、结构体型复杂、安全风险大等施工特点,采用的支撑结构体系,是保证塔柱顶板高质量、安全施工的关键.文章对构皮滩水电站第三级升船机塔柱顶板支撑系统的设计与应用进行了介绍,供类似工程施工参考.

Abstract

The third-stage vertical ship lift at Goupitan Hydropower Station is the largest hoisting vertical submersible ship lift in terms of scale both domestically and internationally. The tower's top plate features significant construction characteristics, including a large construction height, wide span, complex structural configuration, and high safety risks. The support structure system employed is crucial for ensuring the high-quality and safe construction of the tower's top plate. This paper provides an introduction to the design and application of the top plate support system for the third-stage ship lift tower at Goupitan Hydropower Station, serving as a reference for similar construction projects.

关键词

构皮滩/升船机/塔柱顶板/支撑系统

Key words

Goupitan/ship lift/tower top plate/support system