Research on Design and Application of Intelligent Lining Trolley for Long Inclined Well
In view of the need for simultaneous lining construction of multiple working faces with long steep slope and inclined wells as well as the construction defects of the existing trolley, taking No. 2 Construction Tunnel of Xianglushan Tunnel of Water Diversion in Gentral Yunnan as the research object, in this paper, combining with the design concept of digital and intelligent integrated hydraulic steel mould trolley applied in highway, railway and other flat tunnels, the intelligent walking integrated hydraulic trolley is applied to realized the intelligent positioning of inclined well trolley and the automatic monitoring of safety state, which greatly improves the efficiency and quality of the inclined well lining with steep slope.
inclined well with steep slopeconcrete liningintelligent lining trolleyconstruction technology