首页|水工隧洞富水高地应力洞段挤压变形处理

水工隧洞富水高地应力洞段挤压变形处理

扫码查看
水工隧洞施工安全风险高,在施工过程中,要妥善预测各种不良地质情况,尤其水资源丰富的西南地区,并采取有效的处理措施保证施工正常进行.文章以滇中引水工程为例,介绍了大理Ⅱ段施工3标隧洞遇到的富水高地应力洞段的挤压变形状况,结合工程实际情况,将堆渣反压回填、止浆墙、径向固结灌浆、超前预固结灌浆、超前大管棚施工等施工方法有机结合,有效解决了富水高地应力洞段变形突发性强、风险性高、进度缓慢等问题,取得了较好效果,可为类似水工隧洞工程提供借鉴.
Squeezing Deformation Treatment in High-Stress Sections of Water Conservancy Tunnels in Water-Rich Highland
Water conservancy tunnel construction poses high safety risks, and in the construction process, various adverse geological conditions should be properly predicted, especially in the water-rich southwest region, and effective measures should be taken to ensure normal construction. Taking Central Yunnan Water Diversion Project as an example, this paper introduces the squeezing deformation of high-stress section of water-rich highland encountered during the construction of Bid 3 Tunnel of Dali Ⅱ Section. Combined with the actual project situation, construction methods such as backfilling with pile slag, grouting stoppage wall, radial consolidation grouting, advanced pre-consolidation grouting, and advanced large pipe shed construction are organically combined to effectively solve problems such as the high suddenness, high risk, and slow progress of the deformation of high-stress section in water-rich highland. This paper has achieved good results and can provide reference for similar water conservancy tunnel projects.

tunnelwater-richsqueezing deformationtreatment

黄成洋

展开 >

中铁十八局集团第二工程有限公司, 河北 唐山 064000

隧洞 富水 挤压变形 处理

2024

中国水能及电气化
水利部水电局 四川省地方电力局 中国水利水电科学研究院

中国水能及电气化

影响因子:0.316
ISSN:1673-8241
年,卷(期):2024.(4)
  • 8