桃源水电站厂房渗流量通过"集水井水位法"人工换算,其观测精度不高,为了提高监测精度,改进观测方法,结合工程实际研究提出一种新的计算方法:"水位控制集水井容积法",此方法场地和流量适应性强,不受抽排水过程的影响.
Solution for Leakage Monitoring in Taoyuan Hydropower Station Powerhouse
At the Taoyuan Hydropower Station,the leakage flow rate from the powerhouse is traditionally manually calculated using the"water level method"at collection wells,which results in limited observation accuracy.In order to improve monitoring precision,a new method called the"water level-controlled collection well volume method"is proposed,considering practical engineering aspects.This method exhibits strong adaptability to site conditions and flow rates,and is not affected by the pumping and draining processes.