Solution for Leakage Monitoring in Taoyuan Hydropower Station Powerhouse
At the Taoyuan Hydropower Station,the leakage flow rate from the powerhouse is traditionally manually calculated using the"water level method"at collection wells,which results in limited observation accuracy.In order to improve monitoring precision,a new method called the"water level-controlled collection well volume method"is proposed,considering practical engineering aspects.This method exhibits strong adaptability to site conditions and flow rates,and is not affected by the pumping and draining processes.
collection wellleakage volumewater level-controlled collection well volume method