Application of the Buried Installation Technology for Panel Deflection Monitoring Electro-levels in Jiayan Project
In response to the common issues of low instrument survival rate,significant interference during concrete panel pouring,low measurement accuracy,and high costs in current concrete panel deflection monitoring,this paper proposes a set of techniques for buried installation,series connection,and data collection of electro-levels in rock mass engineering dam panel deflection monitoring projects.These techniques effectively improve instrument survival rate and observation accuracy,with work efficiency increased by over 50%.They provide a scientific basis for obtaining long-term monitoring data on panel deflection and evaluating panel performance,and can serve as references for similar projects.