首页|数字孪生水利工程水闸建设研究

数字孪生水利工程水闸建设研究

扫码查看
目前我国水闸工程运行数字化、智能化程度不高,不具备"四预"功能,距离数字孪生水利工程要求相差甚远,还需不断探索更加合理有效的现代化的工程运行管理方法.文章结合江苏沿海大型水闸枢纽工程试点建设,基于已有的数据感知和信息化基础,从数字孪生平台、信息基础设施建设、智能业务应用建设、网络安全体系建设四个方面,系统分析了数字孪生水利工程水闸建设的现状,研究提出了其关键技术为岸线倾斜摄影模型及水下地形采集建模、BIM建模、模型平台建设、知识平台建设.本研究可为数字孪生水利工程水闸建设提供借鉴和参考.
Water Gate Construction of Digital Twin Water Conservancy Projects
Currently,the level of digitization and intelligence in the operation of water gate projects in China is relatively low,lacking the"four preemptive"capabilities,and falling short of the requirements for digital twin water conservancy projects.Continuous exploration of more reasonable and effective modern methods for project operation and management is necessary.This paper,in conjunction with the pilot construction of large coastal water water projects in Jiangsu,systematically analyzes the current state of water gate construction of digital twin water conservancy projects from four aspects:digital twin platform,information infrastructure construction,intelligent business application development,and network security system construction.The study identifies key technologies,including shoreline oblique photogrammetry modeling and underwater topography data collection,BIM modeling,model platform development,and knowledge platform construction.This research provides valuable insights and references for the construction of water gate construction of digital twin water conservancy projects.

water conservancy projectsdigital twinwater gate constructionwater conservancy informatization

胡志浪、李毅、谢昌原

展开 >

江苏省淮沭新河管理处,江苏 淮安 223001

水利工程 数字孪生 水闸建设 水利信息化

2024

中国水能及电气化
水利部水电局 四川省地方电力局 中国水利水电科学研究院

中国水能及电气化

影响因子:0.316
ISSN:1673-8241
年,卷(期):2024.(10)