Research on the Planning of Distribution Network Automation System
Considering all major hardware and software infrastructure,a new multi-stage planning model for improving the distribution network automation system(DAS)was proposesd.Considering the network capacity expansion plan,the proposed method effectively determined the type,location,and time of adding devices or infrastructure to the network.The objective function of the planning problem is to maximize the net profit of the power grid company within the planning time range.In this method,the mixed integer nonlinear programming(MINLP)problem was solved.The proposed method was evaluated on an exemplary testing network and the results obtained were presented and discussed.
distribution networkautomation systemnonlinear programmingnet profit