首页|预制舱式升压站在海上风电中的应用研究

预制舱式升压站在海上风电中的应用研究

扫码查看
为提高质量、缩短工期、方便运维、降低成本,研究了预制舱式升压站在海上风电汇集送出中的应用.首先,对比了传统建造模式与预制舱式海上升压站建造模式的不同.其次,介绍了预制舱式升压站的实施特点.最后,以某 220 kV、600 MW海上升压站设计为例,对比分析了传统海上升压站和预制舱式海上升压站的技术经济指标.结果表明,采用预制舱式建造模式,多舱室平行施工,可缩短升压站建造周期 6~8 周;采用模块化紧凑型布置,升压站整体重量减少 15%~20%.预制舱式海上升压站具有良好的社会经济效益及应用前景.
Research on Application of Prefabricated Cabin Booster Station in Offshore Wind Power
In order to improve quality,shorten construction period,facilitate operation and maintenance,and reduce cost,application of prefabricated cabin booster station in collection and transmission of offshore wind power is studied.First the differences between the conventional construction mode and prefabricated construction mode are compared.Second the im-plementation characteristics of prefabricated cabin booster station are described.Finally,taking the design of a 220 kV and 600 MW offshore booster station as an example,technical and economic indexes of the two modes are comparatively analyzed.The results show that construction period of booster station can be shortened by 6 to 8 weeks by using the pre-fabricated cabin construction mode and parallel construction of multiple cabins,and the overall weight of the booster sta-tion can be reduced by 15%to 20%by using modularized compact layout. The prefabricated cabin type offshore booster station has good social and economic benefits and application prospects.

offshore substationprefabricated cabinmodularizationlightweight

陶仁杰、魏华栋、杨朝晖

展开 >

山东电力工程咨询院有限公司,山东 济南 250013

海上升压站 预制舱 模块化 轻量化