Application of Automated Pre-acceptance Examination Technology for Substation Monitoring Information
Conventional pre-acceptance examination method of substation monitoring information uses point-to-point real transmission and manual verification,which is time-consuming and labor-intensive.This paper proposes a solution for au-tomated pre-acceptance examination of monitoring information,which uses a dedicated tool to simulate the equipment in bay-layer of the substation and automatically trigger signals to the master station,meeting the requirements for full circuit examination.
monitoring informationautomated pre-acceptance examinationbay-layer devicemaster station