首页|三管推挽双向DC-DC变换器电流应力优化控制

三管推挽双向DC-DC变换器电流应力优化控制

扫码查看
为提高三管推挽双向全桥变换器运行效率,提出了一种峰值电流应力优化控制策略.首先,分析了T PBFC变换器扩展移相控制(Extended Phase-shift Control,EPS)下的基本运行模态,推导了系统传输功率与峰值电流应力表达式.进一步,采用拉格朗日函数构建了变换器传输功率与峰值电流应力的约束模型,推导了各运行模态下满足峰值电流应力最小的移相比组合.在搭建的 500 W样机上的实验表明,采用所提出的方法使变换器峰值效率提升了 2%.
Current Stress Optimal Control Strategy of Three-switch Push-Pull Bidirectional DC-DC Converter
To improve the operation efficiency of three-switch push-pull bidirectional full bridge converter(TPBFC),this paper proposes a peak current stress optimization control strategy.First the basic operation mode of TPBFC converter un-der extended phase shift control(EPS)is analyzed,and the expressions of system transmission power and peak current stress are derived.Furthermore the constraint model of transmission power and peak current stress of the converter is con-structed by using Lagrange function,and the phase shift ratio combinations enabling the minimum peak current stress un-der all the operation modes are derived.The adoption of the proposed strategy is found in an experiment on a self-built 500 W prototype to achieve a peak efficiency increase by 2%for the converter.

push-pull converterDC-DC convertercurrent stressLagrangeEPS

陈琦、伍群芳、孙志峰、王玉珮

展开 >

中国能源建设集团江苏省电力设计院有限公司,江苏 南京 211100

江苏省新能源发电与电能变换重点实验室(南京航空航天大学),江苏 南京 210016

推挽变换器 DC-DC变换器 电流应力 拉格朗日 扩展移相

江苏省自然科学青年基金

BK20210305

2024

电工技术
重庆西南信息有限公司(原科技部西南信息中心)

电工技术

影响因子:0.177
ISSN:1002-1388
年,卷(期):2024.(11)