Study on Electrical Testing Strategies for Primary Equipment in Substations
Electric energy,as an energy source converted from other energy sources through certain technological means,is of great significance to national construction and residential life.The substation is responsible for boosting the electrical energy generated by generators and feeding it to high-voltage power grid,as well as distributing the electrical energy from high-voltage power grid to various levels of power grids.The main equipment includes primary and secondary equipment. Among them,primary equipment refers to equipment that directly produces,transports,distributes,and uses electricity,and its management level is closely related to the stable operation of the power system.This paper is based on the actual situation of electrical testing of primary equipment in an actual 110 kV substation.According to the new testing strategy requirements,the electrical testing process of primary equipment has been redesigned to promote the standardization of e-lectrical testing work and ensure the stable and sustainable development of substations.