The scheduling and control of 100 MW electrochemical energy storage stations conventionally rely on directly establishing scheduling framework,skipping over the process of scheduling modeling,and consequently resulting in poor scheduling and control utility.This paper therefore first establishes a scheduling model for 100 MW electrochemical energy storage station to achieve management and control of the station's operational status.Then it constructs a scheduling framework which enables joint scheduling control.The proposed strategy is verified by experiment to have better control utility and practical applicability.
关键词
电化学储能电站/调度策略/控制策略/能量管理系统
Key words
electrochemical energy storage station/scheduling strategy/control strategy/energy management system