Practices on Green Construction of Baituyao 500 kV Transmission Lines
This paper reports the green construction mode adopted in the project of Baituyao 500 kV transmission lines.Following the concept of green construction,the preliminary design of the project achieves maximum avoidance of passing through natural reserves,ecological functional areas,mining areas,photovoltaic plots,etc.through the comparison of multiple path schemes.The utilizations of undisturbed soil foundation technology and new materials facilitate reduction in damage to the original ecology,and energy conservation and emission reduction,respectively.Vigorous promotion of whole-process mechanized construction significantly reduces construction risks,shortens construction time costs,and im-proves construction efficiency.Through"single base planning",precise control of environmental and water conservation is achieved.By optimizing construction technology and layout,and"zero damage"to vegetation at tower positions in artificial forest areas is achieved to greatly improve the level of green construction.
green constructionundisturbed soil foundationnew materialsmechanized constructionsingle base plan-ning