电工技术2024,Issue(17) :152-154.DOI:10.19768/j.cnki.dgjs.2024.17.040

频繁启停调峰9FA燃气机组对外集中供热探讨

Discussion on Feasibility of Frequent Start/Stop and Peak Shaving of 9FA Gas Units for External Centralized Heating

陆亮亮
电工技术2024,Issue(17) :152-154.DOI:10.19768/j.cnki.dgjs.2024.17.040

频繁启停调峰9FA燃气机组对外集中供热探讨

Discussion on Feasibility of Frequent Start/Stop and Peak Shaving of 9FA Gas Units for External Centralized Heating

陆亮亮1
扫码查看

作者信息

  • 1. 国家能源集团海南电力有限公司,海南 海口 570100
  • 折叠

摘要

以频繁启停调峰 9FA燃气机组为例,从技术和经济角度分析纯凝发电 9FA联合循环机组通过系统改造实施对外集中供热可行性,对抽汽成本进行测算,对同类型纯凝发电机组的潜在供热机会具有一定的参考作用.

Abstract

Taking frequent start/stop and peak shaving of 9 FA gas units as an example,this paper analyzes from technical and economic perspectives the feasibility of providing external centralized heating through system retrofit of pure conden-sing generator 9 FA combined cycle units.The steam extraction cost is calculated,which has a certain reference value for potential heating opportunities of similar pure condensing generator units.

关键词

9FA燃气机组/抽汽供热/成本/可行性

Key words

9 FA gas unit/steam extraction heating/cost/feasibility analysis