首页|BIM技术在330kV变电站EPC总承包项目管理应用研究

BIM技术在330kV变电站EPC总承包项目管理应用研究

扫码查看
近年来,随着电力工程建设的高速发展,对施工企业的管理水平及施工能力提出更高的要求.BIM技术作为一种先进的管理手段,能有效提高电力工程管理水平和施工效率,确保工程建设的质量和效益.对此展开研究,首先介绍了BIM技术及CPE总承包模式,其次阐述了 BIM技术在变电站 EPC项目管理各阶段的应用价值,最后结合宁夏某 330 kV变电站工程进行BIM技术的实践应用,结果表明 BIM技术能有效提升 EPC项目精细化管理水平,实现EPC项目管理增值,为提高施工作业效率及施工质量提供有力支撑.
Applicative Study of BIM Technology in EPC General Contracting Project Management of 330 kV Substations
In recent years,with the rapid development of power engineering construction in China,higher requirements have been put forward for the management level and construction capacity of construction enterprises.As an advanced management method,BIM technology can effectively improve the management level and construction efficiency of power projects,and ensure the quality and efficiency of project construction.In this paper,comparative research is carried out.First BIM technology and CPE general contracting model are outlined.Second the application value of BIM technology in all stages of substation EPC project management is systematically elaborated.Finally it is combined with a 330 kV substa-tion project in Ningxia as an example for practical application.The results show that BIM technology effectively improves the level of refined management of EPC projects,realizes the value-added of EPC project management,and provides strong support for construction efficiency and construction quality.

BIM technologyEPC general contractingproject managementsubstationvisualization

常加辰

展开 >

山东电力工程咨询院有限公司,山东 济南 250013

BIM技术 EPC总承包 项目管理 变电站 可视化

2024

电工技术
重庆西南信息有限公司(原科技部西南信息中心)

电工技术

影响因子:0.177
ISSN:1002-1388
年,卷(期):2024.(19)