Analysis of Primary Frequency Regulation Test for New Energy Stations
This article conducted a frequency regulation test on a wind farm in a new energy station.Based on the dynamic performance test of the frequency regulation and simulated actual frequency disturbance test,the active power and fre-quency of the station system were analyzed using a power quality analyzer.The experimental results show that the station has good regulation ability in the primary frequency modulation dynamic performance test and frequency disturbance test,both of which meet the standard values specified in relevant technical requirements in China.
new energy stationfrequency modulation oncedynamic performance