In allusion to the abnormal team safety events in nuclear power projects under construction,the correlation graph analysis is used to determine that team management is a weak link in the safety management of nuclear power engineering projects.Cause-and-effect diagram analysis method is used to analysis the causes of the abnormal statuses of team management such that seven main reasons for the abnormal events of team safety are determined.Based on seven main reasons,a diagnosis model for the safety and health statuses of the base-line nuclear power teams is established.By the iterated mechanism of team safety and health status perception,diagnosis and intervention of the model,the team safety status has been continuously going up and the zero-violation safety teams are created.
关键词
核电/作业班组/安全健康状态/诊断模型
Key words
nuclear power/engineering team/safety and health status/diagnosis model