电力安全技术2024,Vol.26Issue(2) :21-24.

变电站5D-BIM管控平台模型编码方法探究

Study on Encoding Method of 5D-BIM Control Platform Model for Substation

朱琛 周益磊 王娟 付婷 苏颖
电力安全技术2024,Vol.26Issue(2) :21-24.

变电站5D-BIM管控平台模型编码方法探究

Study on Encoding Method of 5D-BIM Control Platform Model for Substation

朱琛 1周益磊 1王娟 1付婷 1苏颖2
扫码查看

作者信息

  • 1. 长沙电力设计院有限公司,湖南长沙 410000
  • 2. 长沙理工大学水利与环境工程学院,湖南长沙 410114
  • 折叠

摘要

以建筑信息模型(BIM)技术在某110kV变电站的应用为例,分析了国家电网有限公司现有的编码规范,探究了融合三维模型、施工进度、费用控制的五维建筑信息模型(5D-BIM)施工项目管理平台模型编码体系,并验证了该编码体系的合理性及有效性,提升了工程运行维护管理水平.

Abstract

Taking the application of building information model(BIM)technology in a 110 kV substation as an example,analyses are conducted on the existing coding standards of State Grid Electric Power Co.,Ltd.,studies are made on the five-dimensional building information model(5D-BIM)construction project management platform model encoding system that integrates three-dimensional models,construction progress and cost control,and the rationality and effectiveness of the encoding system is verified,which improves the level of engineering operation and maintenance management.

关键词

变电站/五维建筑信息模型/模型编码

Key words

substation/five-dimensional building information model/model encoding