电力安全技术2024,Vol.26Issue(4) :40-43.

基于巴歇尔槽的输变电工程施工降水检测系统设计

Design of Engineering Dewatering System for the Construction of Power Transmission and Transformation Projects Based on Bashal Trough

刘玉海 田鑫娜 姜雅男
电力安全技术2024,Vol.26Issue(4) :40-43.

基于巴歇尔槽的输变电工程施工降水检测系统设计

Design of Engineering Dewatering System for the Construction of Power Transmission and Transformation Projects Based on Bashal Trough

刘玉海 1田鑫娜 1姜雅男1
扫码查看

作者信息

  • 1. 国网山东省电力公司建设公司,山东 济南 250001
  • 折叠

摘要

为解决输变电工程施工降水费用结算误差较大的问题,研制了一套基于巴歇尔槽的输变电工程施工降水的检测与分析系统.该系统可检测水泵的排水量与排水时长,分析检测数据,并统计排水总量,准确计算水泵的降水台班,合理控制降水费用,并广泛应用于不同工程中.

Abstract

In response to the problem of significant settlement errors in the engineering dewatering costs of power transmission and transformation projects,a engineering dewatering detection and analysis system for power transmission and transformation projects based on Bashal trough is proposed.The system enables to detect the drainage and drainage time of water pumps,analyze the detection data with a statistics of total drainage,exactly calculate the dewatering shifts per water pump,reasonably control the cost of dewatering,and is available for a variety of projects.

关键词

输变电工程/施工降水/流量检测/降水费用/巴歇尔槽

Key words

power transmission and transformation project/engineering dewatering/flow detection/dewatering cost/Bashal trough