以某设置烟气再循环660 MW二次再热塔式锅炉为研究对象,在锅炉调峰至40%、264 MW负荷下开展性能诊断试验发现锅炉运行存在运行氧量偏大7。1%、干烟气热损失偏大4。68%、省煤器出口NOx浓度高426 mg/m3和SCR脱硝系统喷氨量大574 kg/h的问题。锅炉低负荷运行时,适当开大高低位SOFA风开度有利于改善锅炉SCR脱硝进口NOx浓度和脱硝系统喷氨量。锅炉运行氧量的降低有利于提高锅炉效率、降低SCR脱硝进口NOx浓度、SCR脱硝系统喷氨量和一次风机、送风机、引风机三大风机耗电量,运行氧量调整对机组运行经济性总体大于SOFA风开度的调整。研究结果显示,经过SOFA风开度、运行氧量和烟气再循环风机出力优化调整后,锅炉效率由94。21%提高至94。51%,锅炉省煤器出口NOx浓度由426 mg/m3降低至368 mg/m3,SCR脱硝系统喷氨量由575 kg/h降低至487 kg/h。一次风机、送风机和引风机总功率由6 023 kW⋅h下降至5 748 kW⋅h,一次再热汽温由601℃提高至607℃,二次再热汽温由602℃提高至608℃,机组运行经济性得到明显改善。
Experimental study on economic improvement of updraft boiler under low load
Taking a 660 MW secondary reheat tower boiler as the research object,the performance diagnosis test was carried out under the boiler depth peak load to 40%,264 MW load and found that there were problems of large operating oxygen amount7.1%,large dry flue gas heat loss4.68%,high NOx concentration at economizer outlet 426 mg/m3 and large ammonia injection in SCR denitration system(574 kg/h).When the boiler is running at low load,the proper opening of high and low exhaust air is conducive to improving the NOx concentration of boiler SCR denitrifica-tion inlet and the ammonia injection amount of denitrification system.The reduction of boiler operating oxygen is condu-cive to improving the boiler efficiency,reducing the NOx concentration of SCR denitration inlet,the amount of ammonia injection of SCR denitration system and the power consumption of primary fan,air supply fan and induced draft fan.The operating oxygen amount adjustment of the unit operation economy is generally greater than the adjustment of the exhaust air opening.The results show that after the optimal adjustment of exhaust air opening,operating oxygen amount and flue gas recirculation fan output,the boiler efficiency was increased from 94.21%to 94.51%,the NOx concentration at the outlet of the boiler economizer was reduced from 426 mg/m3 to 368 mg/m3,and the ammonia injection amount of SCR denitration system was reduced from 575 kg/h to 487 kg/h.The total power of primary fan,air supply fan and induced draft fan is reduced from 6 023 kW⋅h to 5 748 kW⋅h,the primary reheat steam temperature is increased from 601℃to 607℃,and the secondary reheat steam temperature is increased from 602℃to 608℃,and the operation economy of the unit is significantly improved.

boilerdeep peak regulationexperimental studyeconomical efficiency

陈辉、方亚雄

展开 >

国家能源集团科学技术研究院有限公司,江苏 南京 210023

锅炉 深度调峰 试验研究 经济性

国家重点研发专项

2022YFC3701504

2024

电力科技与环保
国电科学技术研究院

电力科技与环保

影响因子:0.653
ISSN:1674-8069
年,卷(期):2024.40(2)
  • 25