电力系统装备2024,Issue(1) :83-85.

110?kV主变压器套管头部发热检查与处理

Inspection and Treatment of 110?kV Main Transformer Casing

高德民 魏琨选 王凯 程琪
电力系统装备2024,Issue(1) :83-85.

110?kV主变压器套管头部发热检查与处理

Inspection and Treatment of 110?kV Main Transformer Casing

高德民 1魏琨选 1王凯 1程琪1
扫码查看

作者信息

  • 1. 深圳供电局有限公司,广东深圳 518000
  • 折叠

摘要

在变电站实际运行过程中,主变套管存在温差现象,影响电力系统正常运行的同时,危害电路运行安全.所以需要加强对变电站主变套管头部发热的高度重视,文章基于典型发热缺陷展开深度分析,从中探究发热原因,并采取相对应的降温处理方法,以科学的运维手段解决变压器主变套管发热问题,实现变电站正常工作及电力系统正常运行.

Abstract

During the actual operation of the substation,there is a temperature difference phenomenon in the main transformer bushing,which affects the normal operation of the power system and endangers the safety of circuit operation.Therefore,it is necessary to strengthen the high attention to the heating of the head of the transformer bushing in the substation.This article conducts in-depth analysis based on typical heating defects,explores the causes of heating,and adopts corresponding cooling treatment methods to solve the heating problem of the transformer bushing through scientific operation and maintenance methods,achieving normal operation of the substation and the normal operation of the power system.

关键词

110kV变电站/主变套管/头部发热检查/处理

Key words

110 kV substation/main transformer casing/head heating inspection/treatment