Analysis of Key Technology of Cable Construction in FPSO Construction Project
FPSO(Floating liquefied natural Gas production,storage and unloading unit)is an offshore floating production,storage and unloading unit that integrates production,oil storage and unloading.It is a high-end large-scale offshore engineering equipment specially used for exploitation of deep-sea oil and gas resources,and an important part of offshore oil and gas development.Cable construction runs through the construction and commissioning process of the entire FPSO project,and the work related to cable construction mainly includes bracket installation,cable laying,cable grounding and wiring.Based on the problems in the cable construction process of an FPSO construction process,the cable bracket installation process,cable laying process,cable grounding and wiring process are analyzed,summarized and improved,which can provide strong support and guarantee for the construction period,quality and safety of FPSO construction projects.