电力系统装备2024,Issue(7) :128-130.

脱硫废水零排放系统运行问题分析及改进措施

Analysis of Operational Problems and Improvement Measures for Zero Discharge System of Desulfurization Wastewater

王枫
电力系统装备2024,Issue(7) :128-130.

脱硫废水零排放系统运行问题分析及改进措施

Analysis of Operational Problems and Improvement Measures for Zero Discharge System of Desulfurization Wastewater

王枫1
扫码查看

作者信息

  • 1. 国能河北衡丰发电有限责任公司,河北衡水 053000
  • 折叠

摘要

针对国能河北衡丰发电有限责任公司脱硫废水零排放系统运行可靠性低的问题,分析了加热器堵塞机理、蒸发结晶器积灰原因,并提出了改进方案.

Abstract

In response to the low reliability of the zero discharge system for desulfurization wastewater in Hebei Hengfeng Power Generation Co.,Ltd.,the mechanism of heater blockage and the cause of ash accumulation in the evaporation crystallizer were analyzed,and corresponding improvement plans were proposed.

关键词

脱硫废水零排放/闪蒸加热器/蒸发结晶器

Key words

zero discharge of desulfurization wastewater/flash heater/evaporative crystallizer