通过储能实现9F级燃机黑启动的问题探讨
Discussion on the Problem of Achieving Black Start of 9F Level Gas Turbine Through Energy Storage
张东峰 1陆军 2徐锐 1王保营 2吴锐炎2
作者信息
- 1. 华泰慧能(北京)能源技术有限公司,北京 102208
- 2. 国电投(珠海横琴)热电有限公司,广东珠海 519031
- 折叠
摘要
近些年来,因极端天气原因、地震、战争或线路负载超限等原因造成的大区域性停电事故,需要快速恢复区域供电,保障重点工程.文章通过分析9F级燃机黑启动过程所需的外部电源边界能力,探索9F级燃机通过储能实现黑启动的的可能性、操作流程、关键技术难点、储能系统规模配置、机组相应改造及黑启动过程的控制策略.
Abstract
In recent years,large-scale power outages caused by extreme weather conditions,earthquakes,wars,or excessive line loads have required rapid restoration of regional power supply to ensure the safety of key projects.The article explores the possibility,operational process,key technical difficulties,energy storage system scale configuration,corresponding unit modifications,and control strategies for the black start process of 9F gas turbines by analyzing the external power boundary capabilities required for the black start process of 9F gas turbines through energy storage.
关键词
9F燃机发电机组/黑启动/关键性技术/流程及策略Key words
9F gas turbine generator set/black start/key technologies/process and strategy引用本文复制引用
出版年
2024