首页|一起风电场35?kV集电线路跳闸事件分析

一起风电场35?kV集电线路跳闸事件分析

扫码查看
文章分析了某风电场35 kV集电线路跳闸事件,结合35 kV电缆的运行情况、电缆终端头及中间头的运行情况、电缆头拆解情况,判定了集电线路跳闸的原因,并提出了相应的整改措施,旨在不断提高对集电线路的管理水平,保证风电场的稳定运行.
Analysis of Trip Event of 35?kV Collector Line in a Wind Farm
The article analyzes the tripping event of the 35 kV collection line in a wind farm.Based on the operation of the 35 kV cable,the operation of the cable terminal and intermediate head,and the dismantling of the cable head,the cause of the collection line tripping is determined,and corresponding rectification measures are proposed,aiming to continuously improve the management level of the collection line and ensure the stable operation of the wind farm.

wind farmcollector circuittrip event