文章主要探讨了在光伏发电项目中35 kV电缆的优化布线和安装,提出了结合深度优先搜索、Floyd算法、最优分组及Prim算法的创新方法,以适应项目和地形的特定需求,解决了实际工程中的约束问题,如变压器功率和电缆负荷能力,确保了负载分配的均衡和电缆布线的合理性.方法包括详细的电缆网络建模,并提出了新的线路分组规划策略,讨论了这些方法在实际工程项目中的应用价值和有效性.
A Photovoltaic Field Area Cable Pooling Pine Planning Algorithm
This paper primarily investigates the optimization of 35 kV cable routing and installation in photovoltaic power generation projects.It introduces an innovative approach combining depth-first search,Floyd algorithm,optimal grouping,and Prim's algorithm,tailored to meet the specific requirements of projects and geographical information.The study addresses practical engineering constraints,such as transformer power and cable load capacity,ensuring balanced load distribution and rational cable routing.The methodology encompasses detailed cable network modeling,and proposes a new strategy for line grouping planning.The paper also discusses the practical application value and effectiveness of these methods in engineering projects.

PV field cable path planningPrim algorithmoptimization algorithm

李晋原、杨佳鑫、田羽

展开 >

国电电力综合能源内蒙古有限公司,内蒙古鄂尔多斯 017010

上海电力设计院有限公司,上海 200023

光伏场电缆路径规划 Prim算法 最优化算法

2024

电力系统装备
《机电商报》社

电力系统装备

影响因子:0.008
ISSN:1671-8992
年,卷(期):2024.(12)