A Photovoltaic Field Area Cable Pooling Pine Planning Algorithm
This paper primarily investigates the optimization of 35 kV cable routing and installation in photovoltaic power generation projects.It introduces an innovative approach combining depth-first search,Floyd algorithm,optimal grouping,and Prim's algorithm,tailored to meet the specific requirements of projects and geographical information.The study addresses practical engineering constraints,such as transformer power and cable load capacity,ensuring balanced load distribution and rational cable routing.The methodology encompasses detailed cable network modeling,and proposes a new strategy for line grouping planning.The paper also discusses the practical application value and effectiveness of these methods in engineering projects.
PV field cable path planningPrim algorithmoptimization algorithm