动力学与控制学报2024,Vol.22Issue(11) :82-90.DOI:10.6052/1672-6553-2024-038

公铁两用非对称矮钢塔双层桁架梁斜拉桥抗风性能研究

Study on Wind Resistance of Double-Layer Truss Beam Highway and Railway Cable-Stayed Bridge with Asymmetric Low Steel Tower

姜贺 冯亚成
动力学与控制学报2024,Vol.22Issue(11) :82-90.DOI:10.6052/1672-6553-2024-038

公铁两用非对称矮钢塔双层桁架梁斜拉桥抗风性能研究

Study on Wind Resistance of Double-Layer Truss Beam Highway and Railway Cable-Stayed Bridge with Asymmetric Low Steel Tower

姜贺 1冯亚成2
扫码查看

作者信息

  • 1. 鲁南高速铁路有限公司,济南 250014
  • 2. 中铁第一勘察设计院集团有限公司,西安 710043
  • 折叠

摘要

为研究主跨(84+144+228+240+300+120+60)m的矮塔钢桁梁斜拉桥在设计风速下的抗风性能,选择风洞试验作为主要研究方法,通过节段模型试验和全桥气弹模型试验,对济阳黄河大桥成桥状态和典型施工状态的风荷载及风致响应进行测试,并与桥梁抗风规范进行对比.弹性悬挂节段模型测振风洞试验结果表明,该桥主梁的颤振性能和涡激共振性能均满足抗风安全要求;而全桥试验结论则发现,在0~110 m/s的风力区域内,未观测到主梁颤振和涡激振动现象,也未发现静力失稳情况,且主梁位移响应满足了安全要求和舒适性要求,大桥的抗风性能得到了进一步验证.钢桁架桥的抗风试验研究为设计提供了充分的检验依据,可以供类似的钢桁架工程参考.

Abstract

To investigate the wind resistance performance of the low-tower steel truss cable-stayed bridge with a main span of(84+144+228+240+300+120+60)m under the design wind speed,wind tunnel tests were se-lected as the primary research method.Segment model tests and full-bridge aeroelastic model tests were conduc-ted to measure the wind loads and wind-induced responses of the Jiyang Yellow River Bridge in both the comple-ted state and typical construction conditions,and the results were compared with bridge wind resistance codes.Elastic suspension segment model vibration wind tunnel test results revealed that the flutter and vortex-induced resonance performance of the main beam meets the wind resistance safety requirements.The full-bridge tests concluded that no flutter or vortex-induced vibration of the main beam was observed in the wind speed range of 0~110 m/s,nor were any static instability conditions detected.Moreover,the displacement response of the main beam satisfied both the safety and comfort requirements,thus further verifying the bridge's wind resistance performance.The wind resistance experimental study of the steel truss bridge provides a substantial basis for de-sign verification and can also serve as a reference for similar steel truss construction projects.

关键词

公铁两用桥/斜拉桥设计/风洞试验/抗风性能/风致振动

Key words

highway and railway bridge/cable stayed bridge/wind tunnel test/wind resistance perform-ance/wind induced response

引用本文复制引用

出版年

2024
动力学与控制学报
中国力学学会 湖南大学

动力学与控制学报

CSTPCD
影响因子:0.446
ISSN:1672-6553
段落导航相关论文